Hydroelectric power plant of Trebicka/Radovicka/Mesicke
SGAI S.r.l. has dealt with hydrological, hydraulic and hydroelectric analysis for the final and executive design of the following works:
- Trebicka hydroelectric power plant. Consisting of a tidal barrage made with reinforced concrete crossbar 6.00 m high, with lateral water supply works for a project flow rate of 12.00 m3/s, sedimentation system, junction channel, loading basin, forced pipeline and hydroelectric power station equipped with n. 2 Francis turbines of 4.5 MW each, for a total power installed of 9.0 MW, and a transformation plant, from which the electricity network starts.
- Radovicka hydroelectric power plant. Consisting of a tidal barrage made with reinforced concrete crossbar 6.00 m high, with lateral intake for a projected flow rate of 10.50 m3/s, sedimentation system, branch channel, loading basin, forced pipeline and hydroelectric power station equipped with n. 2 Francis turbines of 3.25 MW each, for a total power installed of 6.5 MW, and a transformation plant, from which the electricity network starts.
- Mesicke hydroelectric power plant. Consisting of a tidal barrage made with reinforced concrete crossbar 6.00 m high, with lateral intake for a projected flow rate of 9.25 m3/s, sedimentation system, branch channel, loading tank, forced pipeline and hydroelectric power station equipped with n. 2 Francis turbines of 2.5 MW each, for a total power installed of 5.0 MW, and a transformation plant, from which the electricity network starts.