Projects

Hydroelectric power plant of Trebicka/Radovicka/Mesicke

  • Location - Country: Albania - Between the provinces of Korce and Corovode
  • Client: SOGLIANO AMBIENTE S.p.A.
  • Time frame: 2012-2013
  • Works amount: € 29'878'612.24
  • Scope of works: Final and Executive design of the following works: hydroelectric power plant of Trebicka/Radovicka/Mesicke
  •   Download project document
Share:   

SGAI S.r.l. has dealt with hydrological, hydraulic and hydroelectric analysis for the final and executive design of the following works:

  1. Trebicka hydroelectric power plant. Consisting of a tidal barrage made with reinforced concrete crossbar 6.00 m high, with lateral water supply works for a project flow rate of 12.00 m3/s, sedimentation system, junction channel, loading basin, forced pipeline and hydroelectric power station equipped with n. 2 Francis turbines of 4.5 MW each, for a total power installed of 9.0 MW, and a transformation plant, from which the electricity network starts.
  2. Radovicka hydroelectric power plant. Consisting of a tidal barrage made with reinforced concrete crossbar 6.00 m high, with lateral intake for a projected flow rate of 10.50 m3/s, sedimentation system, branch channel, loading basin, forced pipeline and hydroelectric power station equipped with n. 2 Francis turbines of 3.25 MW each, for a total power installed of 6.5 MW, and a transformation plant, from which the electricity network starts.
  3. Mesicke hydroelectric power plant. Consisting of a tidal barrage made with reinforced concrete crossbar 6.00 m high, with lateral intake for a projected flow rate of 9.25 m3/s, sedimentation system, branch channel, loading tank, forced pipeline and hydroelectric power station equipped with n. 2 Francis turbines of 2.5 MW each, for a total power installed of 5.0 MW, and a transformation plant, from which the electricity network starts.